| Customization: | Available |
|---|---|
| After-sales Service: | 5 Years |
| Warranty: | 2 Years |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
|
Product Name
|
Spray booth specification #VPB-SD98
|
||
|
Outside Dimension (mm)
|
7000×5350×3400
|
Inside Dimension(mm)
|
6900×3900×2650
|
|
Front Door(mm)
|
3000×2600(W*H)
|
Service door(mm)
|
800×2000(W*H)
|
|
Total Power
|
17kw
|
||
|
Cabin system
|
Front door
|
Sheet metal door, double side with PU insulated
|
|
|
Wall panel
|
50mm rockwool sandwich panel, steel sheet thickness: 0.426mm
|
||
|
Ceiling panel
|
0.8mm galvanized steel sheet
|
||
|
Basement
|
300mm depth construction galvanized basement, full galvanized grids
|
||
|
Ramps
|
Two pieces 2000*750mm ramps
|
||
|
Door glass
|
5mm tempered glass
|
||
|
Air make-up system
|
Air inlet fan system
|
1 set 7.5kw turbo fan, fan model:DDF-630B, with one manual damper
|
|
|
Exhausted fan system
|
1 set 7.5kw turbo fan, fan model: DDF-630B, with one manual damper
|
||
|
Air inlet capacity
|
30000m3/h
|
||
|
Exhausted capacity
|
30000m3/h
|
||
|
Exhausted ducting
|
six meters straight galvanized ducting and two 135 degrees elbows
|
||
|
Purification system
|
Pre-filter
|
G3 grade
|
|
|
Ceiling filter
|
600G filter EU5 / F5
|
||
|
Floor filter
|
Fiber glass filter
|
||
|
Exhausted filter
|
Fiber glass and carbon filter
|
||
|
Heating system
|
Heat Exchanger
|
SUS 304 200KW stainless heating exchanger
|
|
|
Heating burner
|
Riello G20 diesel oil burner (gas burner is for option)
|
||
|
Heating productivity
|
20000Kcal/hour
|
||
|
Spray to baking switch
|
Pneumatic damper
|
||
|
Chimney ducting
|
4 meters chimney ducting and one chimney elbow
|
||
|
heating temperature
|
Maximum 80ºC
|
||
|
fuel consumption
|
6-8L/vehicle
|
||
|
Lighting system
|
Ceiling lighting
|
8 Units, each 4 * 16.5W LED lamps.
|
|
|
Side lighting
|
8 Units, each 4 * 16.5W LED lamps.
|
||
|
Illumination
|
1200LUX
|
||
|
Control system
|
Switch controlling system
|
Spraying & baking switch, lighting switch, timer, temperature controlling switch, emergency stop, breakdown alarm, failure alarm,pressure gauge
|
|

